Liverpool Marina to Leeds Dock by narrowboat
It is 130 miles and 91 locks from Liverpool Marina to Leeds Dock, about 61 hours 26 minutes of cruising, comfortably done in 11 days at 6 hours a day. The route is checked against live closure notices from the Canal & River Trust and the other navigation authorities, and is currently planned around the 11 active stoppages on its waterways (last checked 21 Oct 2026).
Recalculated 6 Aug 2026 against live closures.
The full coast-to-coast crossing of the Leeds & Liverpool Canal, Britain’s longest single canal, starting spectacularly with the Liverpool Link through the city’s dock system. The route climbs out of Lancashire through the twenty-one lock Wigan flight, crosses the Pennines by Foulridge Tunnel and the wild moorland pound at Barnoldswick, then descends past Gargrave, Skipton, Saltaire and Bingley’s Five Rise staircase into Leeds. Around two weeks of the best long-distance cruising in the country.
The route in words
Waterways on this route, in order:
- Liverpool Link Tunnel 3 (tunnel, 1.25 miles in)
- Liverpool Link Tunnel 2 (tunnel, 1.35 miles in)
- Liverpool Link Tunnel 1 (tunnel, 1.42 miles in)
- Gannow Tunnel (tunnel, 73.67 miles in)
- Foulridge Tunnel (tunnel, 83.5 miles in)
- Vauxhall flight (lock flight, 4 locks)
- Wigan flight (lock flight, 23 locks)
- Whittle Springs flight (lock flight, 7 locks)
- Mill Hill flight (lock flight, 6 locks)
- Higherford flight (lock flight, 7 locks)
- Barnoldswick flight (lock flight, 3 locks)
- Bank Newton flight (lock flight, 11 locks)
- Bingley Five Rise (lock flight, 6 locks)
- Sandford flight (lock flight, 5 locks)
- Leeds flight (lock flight, 5 locks)
- Bingley Five Rise (staircase locks)
- Bingley Three Rise (staircase locks)
- Dowley Gap Staircase (staircase locks)
- Field Locks (staircase locks)
- Newlay Locks (staircase locks)
- Forge Locks (staircase locks)
- Oddy Two Rise (staircase locks)
The route works 58 movable (swing or lift) bridges.
Day by day
-
Day 115.75 mi 6 locks 6 h 0 min arrive ~14:00
-
Day 219.25 mi 2 locks 6 h 0 min arrive ~14:00Overnight: Crooke Marina
-
Day 34.14 mi 19 locks 5 h 56 min arrive ~13:56
-
Day 411.14 mi 11 locks 5 h 56 min arrive ~13:56
-
Day 513.95 mi 8 locks 5 h 59 min arrive ~13:59
-
Day 618.05 mi 3 locks 5 h 54 min arrive ~13:54
-
Day 711.63 mi 10 locks 5 h 49 min arrive ~13:49Overnight: Mooring
-
Day 813.1 mi 9 locks 6 h 0 min arrive ~14:00
-
Day 911.36 mi 9 locks 6 h 0 min arrive ~14:00Overnight: Apperley Bridge Marina
-
Day 109.94 mi 9 locks 5 h 50 min arrive ~13:50Overnight: Aire Valley Marina
-
Day 111.82 mi 5 locks 2 h 1 min arrive ~10:01
Before you go
Book ahead: Manchester Ship Canal (Peel Ports / Bridgewater Canal Co.) - booking details.
Book ahead: Foulridge Tunnel (CRT) - booking details.
Live closures on this route
Most planners list stoppages and leave you to plot around them. Canal Nav checks every live notice and plans this route around anything blocking - automatically, each time it is recalculated.
20 live notices on this route's waterways (last checked 21 Oct 2026, 11:30). The live map routes around anything blocking.
-
Closure 2027-02-10 – 2027-02-26
Lock 74 of the Wigan Flight
Read the notice → -
Closure 2027-01-25 – 2027-02-10
Lock 75 of the Wigan Flight
Read the notice → -
Closure 2027-01-04 – 2027-03-12
Crabtree Swing Bridge 32, New Lane
Read the notice → -
Closure 2027-01-04 – 2027-02-19
Lock 87 Wigan
Read the notice → -
Closure 2027-01-04 – 2027-01-22
Dean Lock, Shevington, Wigan
Read the notice → -
Closure 2026-11-16 – 2026-11-27
Lock 25, Bottom Lock
Read the notice → -
Advice 2026-11-14
Bridge 216, Owl Swing Bridge to Bridge 226, Office Lock Bridge
Read the notice → -
Closure 2026-11-02 – 2026-11-13
Lock 68 -Lock 4
Read the notice → -
Closure 2026-11-02 – 2026-12-18
Lock 51, Bottom Lock, Barrowford
Read the notice → -
Closure 2026-11-02 – 2026-12-18
Lock 19, Hirst Lock, Saltaire
Read the notice → -
Restriction 2026-11-02 – 2026-11-16
3rd Party Works - Whitley A19 Bridge, Aire & Calder Navigation
Read the notice → -
Closure 2026-11-02 – 2026-12-18
Locks 13,12 and 11 Newlay Locks, Bramley, Leeds
Read the notice → -
Closure 2026-11-02 – 2026-12-18
Bridge 179C, Union Footbridge, Skipton
Read the notice → -
Restriction 2026-11-02 – 2026-11-27
Bridge 74A, Railway Bridge
Read the notice → -
Advice 2026-11-02 – 2026-12-18
Towpath Closure - L&L , Pinder Bridge and Skipton Hospital, Skipton
Read the notice → -
Advice 2026-11-01 – 2027-03-31
Winter opening times 1 November 2026 to 31 March 2027 - Bingley 3 & 5 Rise and Kirkstall, Forge & Newlay flight
Read the notice → -
Advice 2026-11-01
Bridge 124A, Railway Bridge
Read the notice → -
Advice 2026-10-31
Bridge 216, Owl Swing Bridge to Bridge 226, Office Lock Bridge
Read the notice → -
Restriction 2026-10-26 – 2026-10-30
3rd Party Works - Bridge 211B, Strangford Bridge, Esholt
Read the notice → -
Advice 2026-10-25
Bridge 221, Newlay Stone Bridge to Bridge 221A, New Road Bridge
Read the notice →
Coming back the other way
The return from Leeds Dock to Liverpool Marina covers the same water, the same 130 miles and 91 locks, again over about 11 days - only the overnight moorings shift.
Reverse day-by-day plan
- Day 1: 9.62 mi, 13 locks - overnight Apperley Bridge Marina
- Day 2: 7.27 mi, 13 locks - overnight Mooring
- Day 3: 17.87 mi, 3 locks - overnight Mooring
- Day 4: 9.62 mi, 13 locks - overnight Mooring
- Day 5: 14.87 mi, 7 locks
- Day 6: 15.75 mi, 6 locks - overnight Mooring
- Day 7: 14.87 mi, 7 locks
- Day 8: 2.62 mi, 21 locks
- Day 9: 15.72 mi, 6 locks - overnight Scarisbrick Marina
- Day 10: 18.9 mi, 2 locks - overnight Mooring
- Day 11: 3 mi, 4 locks
Start and finish
Cruising rings touching this route
- Cheshire Ring
Plan it properly
Distances and times are planning estimates (last computed 6 Aug 2026). Always check live closures on the map before setting off.
Cruising Liverpool Marina way? Plan it in minutes.
Turn-by-turn routing with live closures, lock counts and day planning - free.